Comply with manufacturer's instructions. uI0b}q:_H:N=1pC_$;1j8OP$\;MX=+M36XzN6>t+u>fct1*l{m pe
This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. This instruction period shall consist of not less than five (5) eight (8) hour days. The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. 278 0 obj<>stream
Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. Include a detailed review of the following items:
Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. 2.0 GENERAL DESCRIPTION: A. SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. This instruction shall be in addition to instructional requirements of specific equipment specified elsewhere in the mechanical specifications. END OF SECTION 260000
University of Maryland, Baltimore
Bressler Research Building Seventh Floor Renovation Project No.
PDF SECTION 16110 RACEWAYS AND BOXES PART 1 - GENERAL - DeLapp Unless otherwise indicated the coordination drawings, including plans, sections, and elevations shall be prepared at a scale of not less than 1/4 inch = 1 foot- 0 inches.
proposed multipurpose center - international architect's general Supplementary Conditions and Division-1 Specification Sections, apply to this Section. B. We also use third-party cookies that help us analyze and understand how you use this website. Only one submission per System Integrator will be allowed. The following list shall be used as a guide only:
Equipment such as transformers, generators, etc. NECA Standards of Installation
DELIVERY, STORAGE, AND HANDLING
Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. UL (Underwriters Laboratories). INSPECTIONS
Contractor shall:
Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. Related Specification Sections include, but are not limited to, the following: 1. Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. SECTION 16010 . while working on energized systems in accordance with NFPA 70E. Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. 0000003026 00000 n
Omission of words or phrases such as "the Contractor shall", "as shown on Narrow Section Ball Bearings (16000, 16100). Provide an index chart for identification.
PDF SECTION 17010 GENERAL REQUIREMENTS, INSTRUMENTATION ICS. - EandM SECTION 16010 - GENERAL PROVISIONS. Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. 1.01 . With super-finished raceways and controlled geometries, our premium design helps ensure consistent quality. DEMONSTRATION AND INSTRUCTIONS
Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. Tools. #Zkh f9\!A>V=#JM;:Dw. <>
Place grout around anchors. Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. shall meet the requirements of the associated spec section(s). Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions.
PDF Section 16010 - General Electrical Requirements 0000003103 00000 n
l!j=MO_Q7
ze|M|+LUQYm9J]o[_UfO^U|o5_`e::,k?3R
j{`11rW{b@{Lw?mcrfc~b
l
vrOl-~jbG6+)JTz3{ {{.j~@+rin2A:SG!=,wB`q!NU mYfXR{Y hbbd```b``+XLVH&06K 0&_d9;H2b&Ff=~ 90
Division 16 Electrical SECTION 16010 - GENERAL PROVISIONS After such approvals, the CONTRACTOR shall submit the CADD- generated as-built originals, three (3) sets of prints and two (2) sets of electronic files to the CONSULTANT, as well as three (3) sets of operating and maintenance instructions, equipment and parts lists, including addresses of 264 15
Also turn off Underlines.) }SC8/(|X.8\NspWb].uHh8w/0>uxEu$H>THbhOZd4 ph p haP haU B*ph haP h8 B*ph haP haP B*ph h B*ph h"p B*ph h& B*ph hlg B*ph h+V B*ph h"S{ ho h"S{ h9}- h{\V h8 h[P h8 h9}- h8 h#y h"S{ h#y / j Emergency Power. hVk0W=}Xl(&[Xa+ KLbHblwwdM-/cH/Iw?GJec&2%i0h2e5 }7$kFq$$2/[&4{MXymnX*paLB:lWl_-]'vYt./&veAy[rozmIted7m-z3mdSNr]McVEEy]6uN7Y
G#ps(cG-RAUi,K(#XE\X* Vx\Qc `V)3KR$$%[.gg{q0he`H\b$8kP}}@Q }RVyO@T.T.tg11IQjxAFLi=d;k7H- All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. QUALITY ASSURANCE
Comply with NFPA 70 for components and installation. Job site and worker safety are the responsibility of the contractor. Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations.
DTW Works Master Specification Section 16061 - Studylib 4284 0 obj
<>stream
3. Wall Pipe Sleeve Applications: Pipe sleeves shall be required for all new conduit penetrations through rated wall assemblies and non-rated CMU walls. 16010 - 1 . 1.1 GENERAL REQUIREMENTS: A. 3. Cleaning. Perform equipment tests as indicated and directed by the manufacturer, and as specified in Section 16010 and Sections of the Specification specifying equipment and/or systems. Samples shall include physical examples of materials; in complete units for visual inspection. Project Area: The project area shall include the finished spaces and related sections of the utility shafts within the project area footprint. hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I PART 1 - GENERAL . 0000005420 00000 n
.2 This shall generally include work in the following areas: 1 0 obj
Samples shall indicate applicable specification It is the responsibility of the Contractor and its subcontractors to review all sections and ensure a complete and coordinated project. Concrete shall be 3,500 psi twenty-eight (28) day compressive strength concrete and reinforcement bars as specified in the architectural specifications.
The work descried hereunder shall be installed subject to the Contractual Conditions for the entire Specifications. GROUT
Grout shall be non-shrink, high strength type, free of iron or chlorides and suitable for use in contact with all metals, without caps or other protective finishes complying with ASTMC1107, GradeB and the following:
Characteristics: Post hardening, volume adjusting, dry, hydraulic cement grout, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications. hSmk0+q7Pt%i!4GK~ ?lat"=Ye vydw \CnnXVmTG.1IgFb3muJ
M6[]\.I!M{S}/Upc_Ov>Il/tc@U(Bvf-+u=oga$a #c.OyY7;njc dQ)lvy 7J As]S97}y9/7Qu{w}Sc1^~w/(omZB;.2 }@qQ Mg=?X2Wqg?p0O/&swW7qrdS&~ `Owe ]NXzN&~hQE2vJcU#BgO# E RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting General: Construct concrete housekeeping pads to support mechanical equipment were indicated and as detailed on the drawings and as specified herein. View Specification PDF - The Pennsylvania Turnpike. Review contents of manual and video with personnel in detail to explain all aspects of operation and maintenance. endstream
endobj
startxref
See underlined texts for Edits. 1912 0 obj
<>stream
All such outages shall be performed on other than normal duty hours. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Conduit may remain to be reused for new work provided it is of the specified size and type and in condition acceptable to UMB. CLOSEOUT PROCEDURES
Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. NETA (National Electrical Testing Association). In default thereof, owner may have such work done and charge the cost of same to the contractor. @W|$"
PDF Section 16150 - Induction Motors - Eastern Municipal Water District J{H5*aQDi!=GcN`H%{`8Zky:qr\a! 0
RECORD DRAWINGS (As Built)
Upon completion of the electrical installations, the Installer shall deliver to the Architect one (1) complete set of marked-up blueprints of the electrical contract drawings. xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6
:r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. COMAR (Code of Maryland Regulations). Operation. The Terms Listed and Labeled: As defined in the National Electrical Code, Article 100.
Coordinated Drawings: pdf or dwg file formats. PART 3 EXECUTION
ROUGHIN
Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. 0000001264 00000 n
PROTECTION OF WORK
Protect work, material and equipment from weather and construction operations before and after installation. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. REPAIRS & RESTORATION OF SURFACES AND FINISHES:
Restore all finishes, equipment and surfaces to original condition, where affected by the work. The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. qZ*`vC+6`tth?P^u^ 'EHC1ZK$q{)Q8E In addition to the requirements specified in Division 1, the following requirements apply:
Protection of Installed Work: During cutting and patching operations, protect adjacent installations. Preliminary programming information. Corresponding floor plans showing only this particular system with conduit and
wire runs between points. Include the following:
Planned electrical systems layout, including conduit elbow radii and accessories. ANSI/EIA/TIA. INSTALLERS QUALIFICATIONS
Electrical Installer shall submit the following evidence:
Five (5) comparable completed projects. Refer to General Requirements of Division 01 for additional requirements pertaining to Submittals and Record Drawings. Remove and replace Work not conforming to requirements of the Contract Documents. EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic
Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. &F
>`>a$gd$
^ gd;F $ 1.2 Page 1 of 4 REFERENCES .1 American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE). 4188 0 obj
<>
endobj
+"Y3`pHw]|Gq{5ST>#;@ @FF
571 0 obj
<>
endobj
By closing this banner, or continuing to use this website, you consent to the use of cookies. VARIANCES
Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. to a point below the finished floors or behind finished walls and cap. Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. endobj
C. OSHA (Occupational Safety & Health Act). 4. Cover temporary openings for electrical equipment to prevent the entrance of water, dirt, debris, and other foreign matter. 4 0 obj
Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. Shop drawings detailing fabrication and installation requirements for electrical equipment. Section 16151 - Vertical Hollowshaft Electric Motors . Economy and efficiency adjustments. Sizes and location of required concrete pads and bases. ph p hf h8 >*B* IL?nL"a n[. Existing Construction: All new service penetrations through existing rated assemblies shall be provided with a pipe sleeve and sealant materials. G.|,b43f`0pXaE"zs aN
General Provisions | PDF | Electrical Wiring | Specification - Scribd The contractor shall include in his price the cost of all premium time required for outages and other work which interferes with the normal use of the building, which will be performed, in most cases, during other than normal work time and at the convenience of the University. 896 0 obj
<>/Filter/FlateDecode/ID[<4733E1E0B7D7784ABE416F9437B1A7ED><5C11778FF49F854BA974624463381FF3>]/Index[878 27]/Info 877 0 R/Length 92/Prev 228199/Root 879 0 R/Size 905/Type/XRef/W[1 3 1]>>stream
endstream
endobj
11262 0 obj
<>/Metadata 429 0 R/Outlines 455 0 R/PageLayout/OneColumn/Pages 11222 0 R/StructTreeRoot 1524 0 R/Type/Catalog>>
endobj
11263 0 obj
<>/Font<>>>/Rotate 0/StructParents 0/Type/Page>>
endobj
11264 0 obj
<>stream
NJ j5)'~#
4"{:k[k%nK0Er`@ Refer to contract drawings where access panels have been specifically located. It is mandatory to procure user consent prior to running these cookies on your website. Record documents. Provide connectors with insulating bushings. Samples shall indicate applicable specification section number and item numbers within that section. endstream
endobj
879 0 obj
<. ELECTRICAL. CONSTRUCTION RECORD DOCUMENTS
The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. Use operation and maintenance manuals and video as basis of instruction. General Specification for Electrical Works Abu Dhabi Sewerage Services Company ADSSC/GSEW Division 16 Section 16010 Electromagnetic Compatibility (EMC) Rev: 02 Jan. 2011 Page 6 of 7 6. Unless otherwise specified, outages of any services required for the performance of this contract and affecting areas other than the immediate work area shall be scheduled at least ten days (10) days in advance with the Office of Facilities Management. Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. hbbd```b`` SECTION 16010 . Safety procedures. Notification of completion of testing shall be sent to the COMPANY .
2013 0 obj
<>/Filter/FlateDecode/ID[<7A92318D9A66904D9BE2AA2059D48142><9E5BD34DD47A4B4CACDF0D2F3CF07D4E>]/Index[2006 15]/Info 2005 0 R/Length 55/Prev 136060/Root 2007 0 R/Size 2021/Type/XRef/W[1 2 1]>>stream
Trouble shooting. Energized electrical conductors and circuit parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee performs work any time the employee is within the limited approach boundary or, where an increased risk of injury from an exposure to an arc flash hazard exists. The electrical installer shall utilize a full time project foreman in charge of all electrical work. <<8444751DFCD0354687F9FE76EBE71065>]>>
The work to be done under this Division of the Specifications consists of the 0000001635 00000 n
This category only includes cookies that ensures basic functionalities and security features of the website. 0000002587 00000 n
SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS SECTION 16111 - CONDUITS SECTION 16118 - DUCTBANK SECTION 16121 - MEDIUM VOLTAGE CABLE SECTION 16123 - BUILDING WIRES AND CABLES SECTION 16130 - BOXES SECTION 16140 - WIRING DEVICES SECTION 16160 - ENCLOSURES SECTION 16170 - GROUNDING AND BONDING SECTION 16180 - EQUIPMENT WIRING SYSTEMS SECTION 16190 Maintenance agreements and similar continuing commitments. NESC (National Electrical Safety Code). GROUTING
Install nonmetallic nonshrink grout for electrical equipment base bearing surfaces and anchors. 2 0 obj
Access doors. Place markers in corner of tile. Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed.
PDF Section 16010 Basic Electrical Requirements Part 1 - Ieua File Format: Coordination drawings shall be in a layered structure form as CAD Files or PDF Files for each floor with searchable text as follows:
File Structure: The pdf or dwg files shall have separate layered structure for:
Building Elements: Indicate each building element on separate layers, such as:
Walls. Obtain all necessary permits from endstream
endobj
startxref
Available, on site, at all times during construction. Variable frequency drives.
PDF Section 16010 Electrical General Provisions Part 1 - General 1.1 Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope. hbbd``b` $Z ~BARD0 !LAF10t' Provide service and operating manuals for the following:
Division 28 Section Digital, Addressable Fire Alarm System. IT System. This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations. All submitted materials and equipment are subject to approval by the A/E and UMB. 0
11282 0 obj
<>stream
SITE VISIT
Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. Fire rated wall and floor penetrations. L1)Tj4d v"1s%H"r$-j` ,}# Maximum length: (six 6) feet, except where fished. 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 Where coordination requirements conflict with individual system requirements, refer conflict to UMB. Replace ceiling tiles where removal has left holes or cuts in original tiles. Remove conduit, hangers, supports, etc. NEMA (National Electrical Manufacturers Association). 4206 0 obj
<>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream
Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. See Specification Division 01 for general requirements.
Electrical Specifications - [PDF Document] PDF Section 16010 Part 1 - General CONCRETE HOUSEKEEPING PADS
Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. unless otherwise noted. 1.08 TESTING A. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.44 841.68] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
<>
Verify all dimensions by field measurements. Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. ph p he h;F B* 301 and Section 16010 of these Specifications. ANSI (American National Standards Inst.).
%%EOF
Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load But opting out of some of these cookies may have an effect on your browsing experience. Using the UMB Standard O&M Manual Template referenced in Division 01 Closeout Procedures insert the submittal files include both a bookmark and tree structure for accessing each submittal file in the manual.
Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. 2. Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. 3 0 obj
Coordinate connection of electrical services.
PDF SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description A. 1. Deliver on the premises, where directed, existing material and equipment which is to be salvaged and remain property of Owner. Servicing. a$gd;F $ Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." 0000002433 00000 n
%PDF-1.5
%
.1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P
hbbd``b` $V Fg $s6e"A?a)L:= S
` +
&. APPROVED EQUAL EQUIPMENT LAYOUTS
Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. Provide suitable cover plates for all recessed back boxes of equipment removed and not covered by new devices. %PDF-1.5
Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K
y}?3S}~I4H>_yUuSxIZ
C7F"T!5b~Q0; If installers are not experienced in procedures, provide instruction by manufacturer's representatives. They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. %PDF-1.5
%
A. 8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS
Latest Update 03-10-2022.